Describe project cost and the requirements for its determination and application in a production facility.

A project has an expected duration of 34 weeks with a critical path variance of 6. Suppose the project network is given and the critical path is identified on the network. Suppose the normal time, crash time, and the associated cost for each activity is given. You have been asked by your supervisor to prepare a research paper that addresses the follow criteria:

  • What is the probability that the project will be completed in 32 weeks or less?
  • If the project is to be shortened by four days, list the process you would take to determine which activities, in order of reduction, would be shortened and the resulting cost.
  • Describe project cost and the requirements for its determination and application in a production facility.
  • Analyze implications of changes in the parameters of project timing and cost determination.
  • Evaluate application of project cost and timing concepts on a firm’s business operations.

Present your findings as a 1-2 page Word document formatted in APA style.

find the cost of your paper

Critical analysis of Change4Life Campaign

Use Subheadings– but do not use more subheadings than listed below Introduction ● Signpost reader to the contents of your essay Campaign Overview ● Identify the campaign you are focusing….

position in the Apple Valley School district-describes the work of two learning theorists and how you might apply the work of each theorist to the position you are seekin

You are applying for a position in the Apple Valley School district and know that there are several other applicants vying for the position. The district prides itself on employing….

Novel CoronaVirus – COVID-19

-Who is more Susceptible to Corona virus focus on the elderly and how it affect the elderly. -Why the elderly are at the higher risk? – How and why it….